
اطلاعات پروژه
The project for the construction and operation of the oil terminal began in 2017 (1396) on Qeshm Island. The contract type is BOT (Build-Operate-Transfer), and the completion date is set for 2029 (1408).

The project for the construction and operation of the oil terminal began in 2017 (1396) on Qeshm Island. The contract type is BOT (Build-Operate-Transfer), and the completion date is set for 2029 (1408).